Skip to Content

2023 CWSRF Sanitary Sewer System Rehabilitations CS010460-06

Project # CMGM230096(2)

Owner
Wetumpka Water Works & Sewer Board
Location
Wetumpka, Alabama
Bid Date
September 26, 2024 2:30 pm
Bid Type
Sealed Bid
List of Bidders
Video Industrial Services dmahan@videoindustrial.com 205-798-0300
SAK Construction bidcippe@sakcon.com 636-385-1000
Smith Industrial Service Inc. PBDAVID@SMITHIND.COM 251-243-1964
Inliner Solutions, LLC bids@puriscorp@com (470) 503-5624
Vortex Services, LLC. ccorrigan@vortexcompanies.com (713) 750-9081
Slaughter Construction Company Inc. slaucon@slaughterconstruction.com 251-948-7222
Suncoast Infrastructure, Inc. bids@suncoastinfrastructure.com (601) 326-9165
Insituform Technologies, LLC insituformsales@azuria.com (9850 507-2023
Spectrum Environmental Services Inc. rkirkland@specenviro.com 205-664-2000
Forrester Developer, LLC beth@forresterdeveloper.com 334-558-4229
Veit National Corporation patsy@bustillos@veitnational.com 469-354-5981
**** APPARENT LOW BIDDER Gulf Coast Underground, LLC ddavis@gogcu.com 251-725-0200
Contact for Obtaining Bid Documents
Download the Plan Order form located in the Bid Advertisement below. Complete the form and return via email to Ashley.Morris@gmcnetwork.com with a scanned copy of your plan deposit check. Check should be mailed to the Mobile, AL office of GMC. No credit cards are accepted.
Additional Bid Information
The entire Project Manual does not have to be submitted with the Bid.  Do not staple any portion of the bid including bid bond.

This project is being funded by SRF Project No. CS010460-06 and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after the bid opening. Prime contractor must solicit DBE subcontractors, if they are planning to use subs. DBE solicitations should be documented, preferably with a summary table of DBEs contacted, along with the supporting correspondence (email, letter, etc.).

All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (“American Iron and Steel Requirement”) and those imposed by the Build America, Buy America (BABA) Requirements.
Download Documents