Additional Bid Information:
The entire Project Manual does not have to be submitted with the Bid. Do not staple any portion of the bid, all documents should be submitted unbound.
This project is being funded by SRF Project No. CS010956-03 and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after bid opening. This project is being supported, in whole or in part, by federal award number SLFRP2635 awarded to the State of Alabama by the U.S. Department of the Treasury.
All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States (“American Iron and Steel Requirement”).