Viera, Florida

Health First Labor and Delivery Unit

Client
Health First
Contractor
Gilbane
Size
16,700 square feet
Services Provided

This interior build-out transformed the existing space on the 5th floor of Health First Viera Hospital into a 14-bed Labor and Delivery Clinic. Designed with both patients and staff in mind, the new unit features centralized staff support areas, two cesarean operating rooms and an infant nursery.

“The new women’s center brings a state-of-the-art labor, delivery, recovery and postpartum suite to serve the young families in the fast-growing Viera community,” said Jack Monroe, GMC’s healthcare leader in Orlando. “This new facility provides more space for labor and delivery needs, space for families, as well as clinicians and equipment.”
HFViera5thFloor_002
Designed With Care

GMC’s healthcare design team approached this project with empathy and intention, crafting a space that prioritizes comfort and privacy for everyone. The birth suites were thoughtfully designed to support families throughout their entire hospital journey. Each suite includes a private, calming space where parents can remain with their newborns from admission through recovery. The birth suites also include a special button that when pushed, plays a lullaby over the intercom system to celebrate each new birth.

Collaboration and Recognition

This transformative interior project brought new life to the Health First Viera Hospital’s fifth floor. GMC led the architectural vision, with Gilbane managing construction as the general contractor. BCER provided mechanical, electrical and plumbing engineering, while Cripe Architects + Engineers contributed served as the medical equipment consultant.

Together, the team delivered a space that not only meets clinical needs but also elevates the patient experience. In recognition of their work, the HF Viera 5th Floor Labor and Delivery Buildout received the 2025 Build Florida Award from AGC for Best Medical Project under $99M.

1

People

More Projects