Milton, Florida

Cape Horn Marine

Client
Whitesell-Green Construction
Contractor
Whitesell-Green Construction
Size
80,000 square feet
Services Provided

GMC designed a new 80,000-square-foot manufacturing plant for Cape Horn Marine. The pre-engineered metal building with tilt-up concrete wall panels utilizes the newest and most effective equipment to protect the environment inside and outside of their work site. GMC was Architect of Record and also provided contract administration services.

Emissions and by-products of the boat manufacturing process were addressed by incorporating solutions into the construction, including adding an exhaust system that could filter out the styrene emissions that are generated from the fiberglass utilized in boat hulls, incorporating a new acetone recycling machine into the new facility that eliminates waste going in the land fill, and also including the installation of a new solid waste compaction system that helps reduce the volume of material that could eventually end up in a landfill.

Project Gallery

More Projects

Anderson, South Carolina

Form 1095-C and W-2 Availability Notice

In accordance with applicable regulations, Form 1095-C and Form W-2 are available to both current and former employees by logging in to ADP. These forms may also be provided upon request. Current and former employees who wish to receive a copy of either form must submit a request using one of the methods listed below:


Please allow up to 30 days from the date the request is received for processing.