The new central energy plant at Health First’s Holmes Regional Medical Center consists of an entirely new 6,200-square-foot cast-in-place concrete structure designed to replace an outdated power generation facility within a large hospital.

The building encloses four new emergency generators, a new main switchgear, an emergency switchgear, and new offices for the hospital maintenance and facilities department. The scope covered electrical, including the demolition of the old equipment, the retrofitting of switchgear, new generators and fuel distribution, and all new switchgear.
The project also included demolition of two multi-story structures that formerly occupied the site, and oversized parking areas with electric vehicle charging stations. The building represented an opportunity to introduce a more aesthetically appealing streetscape to a less attractive face of the campus, therefore extra attention was given to landscaping, site lighting, and architectural finishes. The generator rooms were also designed with architectural features built-in to help meet the City’s noise ordinance.

In accordance with applicable regulations, Form 1095-C and Form W-2 are available to both current and former employees by logging in to ADP. These forms may also be provided upon request. Current and former employees who wish to receive a copy of either form must submit a request using one of the methods listed below:
Please allow up to 30 days from the date the request is received for processing.