The Jones Walker Corporate Office tenant build-out project was a 17,000-square-foot interior renovation, including the design and construction of the 11th floor of the Wells Fargo Building. The floor was in shell condition, awaiting interior construction. The existing space required minimal demolition to accommodate the new design, as we tried to retain as much of the existing infrastructure as possible.

GMC coordinated with the tenant’s facilities management, and IT teams to incorporate IT, audio/visual, and operational infrastructure. The design inspiration was based on the history and culture of the area surrounding Birmingham and North Alabama, which included the historical traditions steel and marble industries and Birmingham’s modern-day culture of urban sprawl, growing population, urbanism and technology.
GMC is one of the most comprehensive multi-disciplined architecture and engineering firms in the Southeast.
Or email: bids@gmcnetwork.com
In accordance with applicable regulations, Form 1095-C and Form W-2 are available to both current and former employees by logging in to ADP. These forms may also be provided upon request. Current and former employees who wish to receive a copy of either form must submit a request using one of the methods listed below:
Please allow up to 30 days from the date the request is received for processing.