Skip to Content

University Charter School Supplemental Building

Project # ABHM200015B

Owner
University Charter School
Location
Livingston, Alabama
Bid Date
March 26, 2024 2:00 pm
Bid Type
Sealed Bid
Pre-bid Meeting
A mandatory Pre-Bid Meeting is scheduled for 2:00 pm Central, Tuesday March 19, 2024 and will be held at:

108 North Street, Livingston, AL 35470
Contact for Obtaining Bid Documents
Bid documents may be obtained from the Construction Manager, Hall-Taylor
Construction, Inc., 4703 Fosters Industrial Lane, Tuscaloosa, Alabama, 35401 upon deposit of $300.00 per set, which will be refunded in full on the first two sets issued to each trade contract bidder
submitting a bona fide bid, upon return of documents in good condition within ten days of bid
date. Other sets for contractors, and sets for dealers, may be obtained with the same deposit,
which will be refunded as above, less cost of printing, reproduction, handling, and
distribution. Electronic PDF copies of bid documents may be procured from the office of the
Construction Manager free of charge. To obtain electronic PDF copies of the bid documents,
contact Clay Smalley at Hall-Taylor Construction at clays@halltaylorconstruction.com.

Download Documents