Billingsley, Alabama
Tenaska Design-Build Project
1,770 Megawatts
GMC, in conjunction with Reynolds, Inc., completed a design-build project for Tenaska, Inc., which constructed two 885-MW generating stations. The generating stations convert natural gas to electric power. Total project cost for the intake facility was approximately $13 million. GMC’s services included planning, design, environmental, and construction monitoring of an MGD pump station and river intake and a 22-mile-30-inch ductile iron pipeline from the Alabama River near Statesville to Billingsley.
“Goodwyn, Mills and Cawood designed the intake and water supply line for our power plants. They rose to meet our schedule and cost constraints on the project from day one.”
Dan Culver, Project Manager for Tenaska, Inc.